DKK 6,4 million
Contract
LM Wind Power
Builder
New facilities for production in a factory building
LM Wind Power constructs new facilities for production at the factory in Goleniow, Poland.
When establishing the factory Brondum performed and installed 6 storage tanks with mixer plant. Comprising the logistics and freight of the storage tanks from Denmark to Poland.
Brondum also installed pump filters, valve systems and distribution pipe in the factory building for the factory's dosing valves.
Brondum was responsible for handling the subcontractors - among other electrical installations for the entire SCADA control system and local blacksmith companies.